Envelope Systems
Five wall and roof systems we design, test and install. Compare how they perform before you commit.

Area used: 45,000 m²

Pre-Glazed Unit Wall
Unit panels arrive glazed from the factory, so they lift into place in a day and need no sealant curing on site.
- U-value
- 0.27
- Sound rating
- STC 48
- Carbon saved
- 1,949.4 t
- Service response
- 49 min
W/m²K
Sound transmission class
CO₂e per year
Emergency call-out
- Embodied carbon
- 68 kg CO₂e/m²
- Factory lead time
- 6 weeks
How we work
Five steps, from first budget to long-term care.
- 01
Feasibility
We model cost and risk before the design is fixed.
- 02
Value engineering
We simplify fixings and profiles without changing the look.
- 03
Mock-up testing
A full-size sample is tested for air, water and movement.
- 04
Factory assembly
Panels are built in controlled conditions and shipped ready to lift.
- 05
Aftercare
We inspect and maintain walls and roofs after handover.