Skip to content
Daylight

Envelope Systems

Five wall and roof systems we design, test and install. Compare how they perform before you commit.

White ribbed facade curving against a pale sky
White ribbed facade curving against a pale sky
System
Area used: 45,000 m²
Pre-Glazed Unit Wall
Curtain Wall

Pre-Glazed Unit Wall

Unit panels arrive glazed from the factory, so they lift into place in a day and need no sealant curing on site.

U-value
0.27
W/m²K
Sound rating
STC 48
Sound transmission class
Carbon saved
1,949.4 t
CO₂e per year
Service response
49 min
Emergency call-out
Embodied carbon
68 kg CO₂e/m²
Factory lead time
6 weeks

How we work

Five steps, from first budget to long-term care.

  1. 01

    Feasibility

    We model cost and risk before the design is fixed.

  2. 02

    Value engineering

    We simplify fixings and profiles without changing the look.

  3. 03

    Mock-up testing

    A full-size sample is tested for air, water and movement.

  4. 04

    Factory assembly

    Panels are built in controlled conditions and shipped ready to lift.

  5. 05

    Aftercare

    We inspect and maintain walls and roofs after handover.

Back to SKYRISE